- The combination of the simulated shift is set.
- The performance and the cost can be simulated by setting
the cost according to each shift or time period.
- You can simulate how to optimize the new contractor's shift(variable work)
based on the existing fixed shift (ex. Permanent Staff).
The length of the shift is specified, the ratio according to the shift is allocated,
and possible to simulate it.
The length of the shift is specified, the number of people according to the shift
is allocated, and possible to simulate it.
Possible to simulate by obtaining an existing shift, and changing the ratio
according to existing shift.
It is possible to simulate it by reading an existing shift, and changing the number
of people allocated according to an existing shift.